Environmental responsibility has always been at the heart of the construction industry and at DDS, it’s been a guiding principle since day one. For nearly 50 years, we’ve understood the importance of protecting the local community and environment. From our beginnings as demolition contractors, safety and reducing air pollution were our top priorities long before sustainability became an industry standard.
Today, those same values continue to drive us forward. We’re constantly evolving our practices to minimise carbon emissions and reduce the environmental impact of every project we deliver, particularly when demolition is required to make way for new development.
Demolition can sometimes be misconstrued to the outside world, with a stigma surrounding that it creates waste, causes air pollution and contributes to releasing greenhouse gases. Despite this stigma, demolition is a necessary part of preparation for many new site developments and upgrades and should be seen as positive for our evolving landscape.
Having started as a demolition-focused company, we know that demolition isn’t always the best solution. We don’t automatically dismantle every structure that comes our way. Instead, we focus on identifying opportunities to repurpose or reuse existing elements, avoiding unnecessary demolition and disposal. By restoring and adapting structures that still have potential, we significantly reduce project waste and promote a more sustainable approach to construction.
Where 30% of the UK’s overall waste comes from the construction industry, the potential for reuse should be something every building and land owner is aware of and is actively considering before demolition is proposed. We believe this and promote potential for reuse as responsible contractors.
We support clients in deciding on demolition when no alternative solutions are feasible. Such as when a structure or its foundations cannot be modified, and site remediation alone can’t bring the site to a suitable standard for use.
Where structural alterations, repurposing, or reuse are possible, our contracting division suggests tailored solutions to prepare the site for development, creating efficiencies while minimising environmental impact. Our teams have extensive experience in subgrade improvement, infrastructure stabilisation, ground remediation, and reconstruction.
One example of our work with a client to avoid complete demolition, is our involvement in restoring South East Water’s reservoirs in Aylesford, Kent. Read more about this project here (link).
Demolition is still a big part of what DDS does and is known for, but our perspective is that demolition should be considered in planning for regeneration only when there are no other viable options for clients to consider, and with the development’s environmental and economic benefits in mind.