Demolition of 1-3 Church Street, including ACMs removal and break out of all slabs and foundations. As part of the ‘Transforming Nuneaton’ initiative, we completed demolition and enabling works at 1-3 Church Street, Nuneaton, on behalf of Warwickshire County Council. The project included strip out of the three buildings, removal of licensed and non-licensed asbestos […]
Demolition and Dismantling of the ED1 Link Span Bridge within the Port of Dover Eastern Docks.
Demolition and site clearance of former leisure centre and the protection and preservation of the historical ruins of St James Church.
The partial demolition and height reduction of the Prince of Wales Pier at Dover Harbour.
Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site.
Demolition of the PM1 paper mill buildings in Kent, facilitating construction of the new PM9 paper mill.
Demolition of a 4-storey building, extensive groundworks and 5-storey RC Frame construction.
Emergency ground stabilisation, partial demolition and reconstruction works of a strategically critical water reservoir asset.
Industrial demolition of the former MAN 2 Engineering Block for client Givaudan. As Principal Contractor, we recently completed the demolition of the former MAN 2 Engineering Block for client Givaudan, at their operational site in Ashford, Kent. Working within a live industrial environment, the project required a carefully planned approach to protect adjacent pipe gantries […]
Turnkey package combining demolition of a 4-storey building, extensive groundworks, and 5-storey RC frame construction. DDS Group’s abilities to deliver a complete turnkey solution were illustrated at the site of Ashford Fire Station. Practicing a collaborative approach with client Morgan Sindall, we carried out an extensive scope of works comprised of both demolition and groundworks; […]
Top-down demolition of 2 multi storey carparks within Dover Docks
Demolition of Berkeley House and associated structures, including grubbing up of slabs and foundations.
Demolition of commercial properties, site remediation and enabling works in preparation for 159 new homes.
Demolition of non-listed and no-curtilage listed commercial buildings, whilst protecting grade II listed buildings on site.
Demolition of the existing Riverside site; the scope including demolition of 15 structures, over two phases.
Demolition of various buildings, as part of a 1,200-home development; the works included a mixture of single and two-storey buildings.
DDS Demolition undertook the demolition and land remediation in two phases. The site comprised of former brickworks which included the presence of drying sheds, kilns, production buildings and stores.
The modification and refurbishment of the Former Hornby Hobbies building, following initial demolition and asbestos removal.
Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site