  • Nuneaton Library & Business Centre

    Demolition of 1-3 Church Street, including ACMs removal and break out of all slabs and foundations. As part of the ‘Transforming Nuneaton’ initiative, we completed demolition and enabling works at 1-3 Church Street, Nuneaton, on behalf of Warwickshire County Council. The project included strip out of the three buildings, removal of licensed and non-licensed asbestos […]

    Abbey Road Car Park

    Multi storey car park demolition, Abbey Road, London.

    Dover Docks (ED1) Ferry Link Span Bridge

    Demolition and Dismantling of the ED1 Link Span Bridge within the Port of Dover Eastern Docks.

    Dover Leisure Centre

    Demolition and site clearance of former leisure centre and the protection and preservation of the historical ruins of St James Church.

    Fulham Gas Works

    Demolition, Site Clearance and Site Remediation.

    Prince of Wales Pier

    The partial demolition and height reduction of the Prince of Wales Pier at Dover Harbour.

    Richborough Power Station

    Demolition of power station buildings, cooling towers and chimney.

    Sheerness Steel Mill

    Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site.

    Smurfit Kappa Paper Mill Demolition

    Demolition of the PM1 paper mill buildings in Kent, facilitating construction of the new PM9 paper mill.

    Sovereign Court

    Demolition of an 8-storey office block and multi storey carpark.

    St James Retail Park

    Demolition of a 12-storey office block, multi-storey carpark, hotel and shops.

    Thames Valley University

    Demolition and site clearance of two 6 storey office blocks.

    Ashford Fire Station

    Demolition of a 4-storey building, extensive groundworks and 5-storey RC Frame construction.

    Aylesford Reservoirs

    Emergency ground stabilisation, partial demolition and reconstruction works of a strategically critical water reservoir asset.

    Bench Street Regeneration

    Demolition and site clearance of dilapidated and dangerous buildings.

    Canterbury Prison Demolition

    Demolition and enabling works at the former Canterbury prison.

    Connaught Barracks

    Demolition and site clearance of former Army Barracks.

    MAN 2 Engineering Block, Ashford

    Industrial demolition of the former MAN 2 Engineering Block for client Givaudan. As Principal Contractor, we recently completed the demolition of the former MAN 2 Engineering Block for client Givaudan, at their operational site in Ashford, Kent. Working within a live industrial environment, the project required a carefully planned approach to protect adjacent pipe gantries […]

    Ashford Fire Station

    Turnkey package combining demolition of a 4-storey building, extensive groundworks, and 5-storey RC frame construction. DDS Group’s abilities to deliver a complete turnkey solution were illustrated at the site of Ashford Fire Station. Practicing a collaborative approach with client Morgan Sindall, we carried out an extensive scope of works comprised of both demolition and groundworks; […]

    Dover Docks Multi Storey Car Parks

    Top-down demolition of 2 multi storey carparks within Dover Docks 

    Mulberry Wharf

    Demolition of asbestos clad steel frame warehouses.

    Berkeley House

    Demolition of Berkeley House and associated structures, including grubbing up of slabs and foundations.

    Hyleford Hostel, Loxford Lane

    Demolition of commercial properties, site remediation and enabling works in preparation for 159 new homes.

    Kent Wool Growers

    Demolition of non-listed and no-curtilage listed commercial buildings, whilst protecting grade II listed buildings on site.

    Phase 2 Riverside, Kingsmead Road

    Demolition of the existing Riverside site; the scope including demolition of 15 structures, over two phases.

    Port of Ramsgate

    Demolition of the passenger terminal building and associated two storey buildings.

    Nash Road

    Substructure construction and enabling works for 49 one and two bedroom apartments.

    Risborough Barracks

    Demolition of various buildings, as part of a 1,200-home development; the works included a mixture of single and two-storey buildings.

    Springwood

    Enabling and groundworks for the development of two NHS accommodation blocks.

    Bromley North Carpark

    Demolition and enabling works at the former site of Bromley North Carpark.

    Former Naccolt Brickworks

    DDS Demolition undertook the demolition and land remediation in two phases. The site comprised of former brickworks which included the presence of drying sheds, kilns, production buildings and stores.

    Hornby Hobbies

    The modification and refurbishment of the Former Hornby Hobbies building, following initial demolition and asbestos removal.

    Steel Mill Enabling

    Industrial Demolition and Site Remediation of the 50acre Sheerness Steelworks Site