Aylesford Reservoir

Start a Project
Return to Case Studies
Location
Aylesford, Kent
Status
Complete
Division
Contracting

Reconstructing clean water reservoirs

The South-East Water clean water reservoirs off Hermitage Lane in Maidstone served 6,000 homes as well as Maidstone Hospital before it was identified that they were sinking in 2020. The water supply to the area was re-routed at the time and emergency contingency plans to supply the area put in place.

Each of the two concrete surface reservoir tanks were seriously damaged; sinking into the ground, and with their roofs collapsing. DDS Demolition were originally asked by South-East Water for their costs to demolish the tanks. However, through detailed ground investigation, surveys and modelling, DDS Contracting working as the Principal Contractor, alongside Atkins Realis and South-East Water, developed a strategy that has led to us retaining and re-using 75% of the existing structures.

Of the two original tanks, half of one was unsalvageable. The eventual package of works carried out by DDS involved partial demolition but ultimately, focused on the reconstruction of the reinforced concrete storage tank to create two cells which will hold a total volume in excess of 9 million litres.

Atkins’ use of innovative geophysical techniques (such as ERT, subsurface and submarine drone surveys) delivered a collaborative digital twin, which informed decision-making in design, and has continued to save time and costs throughout construction.

The critical ongoing evaluation of the site conditions was possible through this digital twin, utilising a ducted telemetry network and further survey solutions installed both underground and within the structures themselves.

Infilling with foamed concrete to the depth of bedrock in some areas, together with pressure grouting through the tank bases to improve the subgrade, securing of the infrastructure, repairs to existing pipework assets, ground remediation and new drainage solutions, all in addition to the reconstruction of the reservoir tanks themselves.

These extensive and quite unique remedial works have been ongoing since November 2020. Partial water supply commenced in July 2023 and the full project completed, including both tanks in operation and ground fill around the tanks, finally, in August 2023.

The innovative, collaborative and cost-effective approach adopted has gained recognition and awarded an ‘Outstanding Achievement’ certificate in the 2023 Going Digital Awards in Infrastructure as well as winning the 2023 Utility Week Awards' category for Infrastructure Delivery.

About
DDS Contracting

DDS Contracting forms the Groundwork and Civils Division of the DDS Group. Often operating as a natural extension to DDS Demolition, we are able to offer our clients a complete turnkey enabling works solution.

Service Used
  • Bulk Excavation
  • Civil Engineering
  • Dismantling & Deconstruction
  • Drainage
  • Reinforced Concrete Structures
  • Site Remediation
  • Structural Alterations
  • Substructures
Request a call-back

    Ready to talk?

    At DDS Group Ltd, our mission is to provide our clients with the highest quality turnkey solution in an ever-changing environment, defined by safety, integrity, honesty and trust, whilst promoting a healthy work environment for all employees, where a respect for diversity and room for growth culminates in exceptional service and company spirit.

    Contact Us

    We’re a group of companies based in Kent, committed to excellence in construction, demolition, reclamation, salvage and building material supply.

    Contact Us

    If you’d like more information on the group or or any of our divisions, please contact us.

    Contact Us

    Copyright © 2024. DDS Group. Member of 1948 Group.