Working within Europe’s busiest ferry port, DDS dismantled the main carpark structures over the Dover Docks live ticket and terminal building. The scope incorporated a combination of asbestos removals, removal of asphalt surfacing, and top-down demolition.
Operations remained live across the port, undisturbed; a credit to our team’s rigorous traffic and pedestrian management plans. Further risk management included continuous dust, noise, and vibration monitoring, and extensive scaffolding and crash deck protection, to ensure operations across the port were not affected.