Turnkey package combining demolition of a 4-storey building, extensive groundworks, and 5-storey RC frame construction.
DDS Group’s abilities to deliver a complete turnkey solution were illustrated at the site of Ashford Fire Station. Practicing a collaborative approach with client Morgan Sindall, we carried out an extensive scope of works comprised of both demolition and groundworks; including high reach employment, ground slab and foundations break out, alongside construction of a reinforced concrete frame structure.
Employing both DDS Demolition and Contracting divisions, the site was seamlessly transitioned from demolition of the 1990s 4 storey building through to the 5 storey RC frame construction. Upon scheduled return to site, we then conducted the external works including drainage installations, excavations, kerbing, and tarmac surfacing. This new structure will facilitate Kent Fire & Rescue Service (KFRS) Live Fire Training; the 5 storey RC frame construction (a first for DDS Group) will serve as the first of its kind in the country, in terms of live fire training.