Demolition of a 4-storey building, extensive groundworks and 5-storey RC Frame construction.
DDS Group’s abilities to deliver a complete turnkey solution were illustrated at the site of Ashford Fire Station. Practicing a collaborative approach with client Morgan Sindall, we carried out an extensive scope of works comprised of both demolition and groundworks services; including high reach employment, ground slab and foundations break out, alongside construction of a reinforced concrete frame structure.
Employing both DDS Demolition and Contracting divisions, the site was seamlessly transitioned from demolition of the 1990s 4 storey building, through to the topping out of the 5 storey RC frame, involving piling attendance throughout installation and capping. The establishment of the reinforced concrete structure will facilitate Kent Fire & Rescue Service (KFRS) Live Fire Training; the 5 storey RC frame construction (a first for DDS Group) will serve as the first of its kind in the country, in terms of live fire training.