Bath Road, Slough

Internal Strip out of a five-storey commercial office development

DDS Group successfully carried out extensive internal soft strip of a large 5 floor commercial office development in Slough. The project spanned a duration of 9 weeks, and included strip out of all levels, whilst preserving the structure and entire external envelope, including all windows, lift shafts, staircases and steel structural members.

All waste materials produced during works were sensitively removed from the building via the internal fire staircase, preventing disturbance to the retained façade. 90% of flooring materials were salvaged and credited back to the client, reflecting our dedication to high recycling rates.

Location

Slough, Berkshire

Client

Return Property Services Ltd.

Status

Duration

9 Weeks

Service Used

Soft Strip, Strip Out