Berkeley House

Demolition of Berkeley House and associated structures, including grubbing up of slabs and foundations.

DDS Group were appointed to undertake demolition and clearance of the former Berkeley House site. The scope of works included initial strip out and non-licensed asbestos removal (carried out in-house by DDS Group’s CAT B trained operatives), followed by demolition of numerous structures.

The structures on site, varying from steel frame structure and brickwork outer walls to traditional load bearing masonry, were demolished mechanically using traditional methods. Following demolition of all structures, DDS Group carried out grubbing up of all slabs and foundations, 1300m2 tarmac, 1300m2 block paving including kerbs, and bulk excavation. All arising material was crushed on site. Consistent liaison with UKPN throughout works enabled DDS to coordinate the diversion of the electrical supply and connection to the TPS box installed on site.

Location

Sevenoaks, Kent

Client

Vision Construct

Status

Duration

8 Weeks

Service Used

Soft Strip, Asbestos Removal, Demolition, Strip Out
Watch Full Video