The complex Connaught Barracks contract comprised numerous elements including hazardous material removal, soft strip works, and demolition of 33no. buildings down to ground slab level. Throughout the project, all demolition arisings, rubbish and soft strip materials, were removed, followed by an ultimate site clearance upon demolition completion.
Unexpected constraints presented themselves during the project duration, including unknown asbestos within the ground, and bats on site. However, despite these occurrences, the project was accelerated, with additional swift and efficient action, mitigating programme slippage. To encourage the biodiversity presence on site, and accommodate the species of bats, DDS retained a portion of the existing structures and constructed new roof erections, converting these into ‘bat hotels’.