DDS were awarded the contract to demolish the Roll-on, Roll-off Ferry Ramp (known as ED1) in the Eastern Docks within the Port of Dover, following a successful working relationship with the Port of Dover that spans over fifteen years.
The works comprised the demolition of the redundant linkspan bridge at Berth No.1 in Eastern Docks, alongside removal of below water level tank structures and concrete foundations, demonstrating our capability and competence regarding complex lifting operations. Below water level operations included extensive marine surveys, removal and disposal of the ballast tank structure and concrete foundations – all of which was conducted with strict adherence to the MMO License.