Substructure construction and enabling works for 49 one and two bedroom apartments.
Following successful conduction of asbestos removals and demolition, within the Nash Road site just one mile from our Group headquarters, DDS Contracting were appointed to undertake the extensive scope of groundworks.
The contract incorporated RC substructure implementation, drainage, and 278 works, enabling the subsequent construction of the collection of 49 one- and two-bedroom apartments. Throughout the project, DDS ensured consistent site presence, including attendance on both sheet piling and CFA piling works. DDS liaised regularly with the client, allowing us to work side-by-side whilst their tower crane was erected.