DDS Demolition carried out both phase 1 & 2 within the existing Riverside site to enable Bouygues to undertake construction of the proposed mixed-use development. Phase 1 consisted of demolition of 10no. structures including the former Serco depot site, followed by phase 2 which incorporated demolition of 5no. structures covering 35,000m².
Works prior to demolition, within phase 2, commenced with service terminations across site, licensed and non-licensed asbestos removals, Japanese Knotweed removal, vegetation clearance, and soft strip of the structures. The 5no. structures, ranging from load bearing brick to steel frame construction were then demolished down to ground level, followed by break out of ground slabs and foundations, removal of 2no. large underground tanks and contaminated ground.