Within the site of Richborough Power Station, DDS Group carried out the demolition of the redundant Power Station and Ancillary structures. Works commenced with asbestos removals, soft strip of all fixtures, fittings and combustible materials, in addition to pumping out and discharging of 160,000,000 litres of water from ponds and underground chambers.
The power station structures and ancillary buildings (16no.) were then progressively demolished alongside the raze of 1no. chimney (127m), and 3no. cooling towers demolished to the ground by explosive means. The explosive demolition required careful and robust planning to mitigate risk to the greatest possible extent – including the management of over 100 personnel, coordination with numerous external stakeholders, and the scheduling of the programme around bird migration seasons.‘DDS Demolition assisted far and beyond what could have been reasonably expected and created a fantastic client-contractor relationship. I cannot recommend their services highly enough‘.
– Client