DDS Group carried out a major redevelopment project for Secure Storage Solutions, operating as Principal Contractor on a Design and Build basis with Salluz Construction Consultants. The works included partial demolition of the fire-damaged structurally unstable mushroom farm; structural alterations and additions, complete overhaul of the building envelope, construction of a fully serviced reception and offices. Together with a large package of groundworks services, external works and utilities, we also procured and managed the specialist fit out of the storage facility.