DDS Group delivered a full turnkey solution within the live environment of Sheerness Steel Mill. The £6.9m contract comprised asbestos removal, demolition, dismantling, drainage, and site remediation – conducted over a 3-year period.
The project commenced with the employment of DDS Demolition to carry out service terminations, full demolition of buildings on site, alongside pre-weakening and internal plant strip of the largest structure. DDS Contracting provided multiple phased design & build packages including groundworks remediation, UKPN trenching, substation and HGV haul road construction, surfacing, drainage installations and development of a site wide land drainage strategy.