Consisting of 2 phases, DDS Group conducted the strip out and demolition of West 45 office block and King Mall Shopping Centre multi storey carpark in Hammersmith, London.
Phase 1 comprised notifiable and non notifiable asbestos removals, soft strip and demolition of the office block and half of the multi-storey car park – all whilst retaining public function of the car park; a demolition solution was devised by DDS to ensure maintenance of structural stability. Along the cut line of the car par, an acoustic jumbo stud wall was installed to dampen the noise created from the demolition process, minimising public disturbance. Phase 2 consisted of the remaining demolition works; a combination of top-down and high reach methods.
The site presented numerous unique constraints to consider, including the railway lines occupying the southern site boundary. In response, DDS Group and St George collaboratively gained London Underground approval, with scheduled attendance throughout the works. A multitude of temporary works were established throughout, to achieve minimum disturbance and maximum safety, including protective scaffolding and temporary propping.