Springwood

Start a Project

Enabling and groundworks for the development of two NHS accommodation blocks 

Following the successful demolition of two former key worker accommodation blocks by DDS Demolition, DDS Contracting secured the main groundworks package for Jenner Contractors – facilitating the construction of 2 new blocks to provide 160no. NHS key worker apartments.

DDS Contracting attended throughout extensive piling operations; a number of techniques were employed due to the challenging ground conditions. Reinforced concrete beams were subsequently installed, followed by a large below ground booster tank and new substation. Additional works included a foul and storm drainage network with offsite connections in the adopted carriageway, S278 works and hard landscaping.

‘Having been introduced to DDSC through their demolition arm DDSD, they have gone from strength to strength. With their attention to detail, flexibility, and excellent technical knowledge across the board, they have stolen a march on many of their rivals.’

– Client

Location

Maidstone, Kent

Client

Jenner

Status

Completed

Duration

18 weeks (two visits)

Service Used

Soft Strip, Demolition, Drainage, Groundworks, Highway Works, External Works, Contracting